[1]
Qi, P. et al. 2022. Influence of pipe jacking excavation in overlying quicksand layer on surface settlement and numerical analysis. Highlights in Science, Engineering and Technology. 18, (Nov. 2022), 20–25. DOI:https://doi.org/10.54097/hset.v18i.2518.