[1]
S. Liu, J. . Dong, and X. . Dong, “A backfill construction technology for ultra-deep and ultra-narrow foundation trenches with high-early-strength soil cement”, HSET, vol. 10, pp. 6–11, Aug. 2022, doi: 10.54097/hset.v10i.1198.