[1]
Hang, C. 2025. Research on Plugging Technology of Underwater Shield Tunnel During Operation Period. Academic Journal of Science and Technology. 15, 1 (Apr. 2025), 173–178. DOI:https://doi.org/10.54097/p8mqte43.