1.
Li K, Wang J, Wang C, Li J, Zhao P, Li Y. Study on Sintered Ore Production Process Modeling and Dynamic Optimization Driven by Multi-Algorithm Integration. FCIS [Internet]. 2026 Feb. 27 [cited 2026 May 25];15(2):1-6. Available from: https://drpress.org/ojs/index.php/fcis/article/view/34002