Wei, Z. and Tong, S. (2025) “Research on Deepening and Optimizing the Special Plan for Deep Excavation Based on Subway Engineering Site Information”, International Journal of Energy, 6(3), pp. 73–78. doi:10.54097/nv5qkm24.