[1]
S. Liao, “Review of Just-in-Time Material Distribution Scheduling for Mixed Flow Assembly Lines Considering Transfer Vehicle Handling Energy Consumption”, JID, vol. 3, no. 1, pp. 126–131, May 2023, doi: 10.54097/jid.v3i1.8434.