Research on Mechanical Contact Channel
DOI:
https://doi.org/10.54097/pfpehb28Keywords:
Mechanical construction; contact channel.Abstract
In the soft soil layer, the contact channel is usually constructed by mining method, and the surrounding soil is reinforced by grouting or freezing. The conventional freezing method has problems such as ' long construction period, high cost and quality hidden danger ', and grouting reinforcement has problems such as ' occupying ground space '. In order to solve the unfavorable factors caused by the above construction methods, this paper puts forward the technology of non-reinforcement and mechanical construction of contact channel. This technology has certain advantages in safety, construction period and cost. It is of positive significance to systematically carry out the research and development of mechanical connection channel technology to promote the development of the industry and improve the technical level of underground engineering. In order to deal with the difficulties and risks of the construction of the mechanical method connecting passage in the region, based on a tunnel project, the construction quality management system of the mechanical method connecting passage is expounded, and the on-site monitoring and analysis are carried out. The results show that the construction technology applied in this project is conducive to improving the construction efficiency and ensuring the construction safety. The research results can provide reference for the mechanical construction of the connecting passage under similar stratum conditions.
Downloads
References
[1] Ding Jianmin, Zi Bo, Mo Zhenze, etc. Field test research and analysis of T-joint tunnel with pipe jacking method [J]. Tunnel construction ( Chinese and English ), 2020,40 (01) : 28-34.
[2] Zhu Yaohong, Gao Yimin, Dong Zibo, et al. Shield method T-joint tunnel structure. Field test study on the force-taking the connecting passage of Ningbo Rail Transit Line No.1 as an example [J]. Tunnel construction (Chinese and English), 2019,39 (11): 1759-1768.
[3] Wei Jiaying, Ma Yongzheng, Mo Zhenze, et al. Study on the variation characteristics of strata uplift and subsidence in T-joint construction of mechanical connecting passage [J]. Tunnel construction (Chinese and English) 2020,40 (S2): 136-143.
[4] Zhou Xiaomin, Su Lifan, He Changjun, et al., Beijing Subway Tunnel Construction by Freezing Method [J] Journal of Geotechnical Engineering, 1999, 21 (3).
[5] Ren Zhijian, She Caigao, Design and Construction of Shield Tunnel Connection Channel of Nanjing Metro [J] Urban Rapid Rail Transit, 2005 (5).
[6] Du Chuangdong, Wang Kun, large diameter slurry shield segment in weak water-rich stratum Analysis of Floatation and Faulting [J]. Tunnel Construction, 2011,31 (2).
[7] Zhang Zhiqiang, He Chuan, used the freezing method to build the construction force of the subway connection channel. Research [J] Journal of Rock Mechanics and Engineering, 2005, 24 (18).
[8] Ji Chang, Zhou Shunhua, Xu Kai, et al., shield tunnel segment construction period Field experimental study on influence factors of buoyancy [J]. Rock mechanics and engineering 2013,32.
[9] Wang Dongfang, Zhang Weixi, Dong Zibo, et al., quasi-rectangular shield tunnels field test study of lining structure stress [J]. Modern tunnel technology. 2016,53 (6).
[10] Li Ming, high-pressure water-rich strata shield tunnel connecting channel freezing method construction study on the supporting method of tunnel structure [ D ].Beijing : Beijing Jiaotong University, 2008.
Downloads
Published
Issue
Section
License
Copyright (c) 2025 Academic Journal of Science and Technology

This work is licensed under a Creative Commons Attribution 4.0 International License.