Performance Evaluation of Engineering Management Based on Hierarchical Analysis Approach
DOI:
https://doi.org/10.54097/riivnhm7Keywords:
Engineering Management, Performance Evaluation, Hierarchical Analysis, Hierarchical Structure, Weight DeterminationAbstract
With the increasing scale and complexity of engineering projects globally, scientific and effective performance evaluation of engineering management has become a key factor in improving project success. The purpose of this paper is to assess the performance level of engineering management in a systematic and hierarchical way by applying hierarchical analysis (Hierarchical Analysis) to improve the efficiency of project execution, reduce the risk and enhance the likelihood of project success. Typical examples of water conservancy project management in Yunnan were selected to quantitatively evaluate water conservancy project management by applying the hierarchical analysis method with comprehensive assignment. Combined with the evaluation results and the typical problems of the current traditional water conservancy project management, relevant suggestions for the implementation of the property-based management model are put forward.
Downloads
References
H.L. Chen,R.B. Wei,X.P. Men. Association analysis of social network analysis methods with research themes[J]. Intelligence Science,2022,40(09):38-46.
Chen Zhiming. Application of Key Performance Indicator (KPI) Method in Performance Evaluation of Commercial Banks[J]. Finance and Accounting Study, 2023, (28):131-133.
Wang Shanhua. Research on Performance Evaluation of Rural Small-scale Water Conservancy Project Management System Reform [D]. Nanjing Agricultural University,2017.
Zhang Hui, Wang Yan fang, Yang Lan, Wu Xin jia. Performance evaluation of water-saving irrigation informationization project construction management based on FAHP method[J]. Journal of Bengbu Institute, 2021,10 (02): 116-122.
Chen Jianming, Cheng Fine-Ying, LI Meifeng. Evaluation of water ecological effects in coastal reclamation area of Jiangsu Province based on hierarchical entropy weight method[J]. Water Resources Economy, 2020, 38 (02): 43-48+61+83.
Elonen S, Artto A K . Problems in managing internal development projects in multi-project environments [J]. International Journal of Project Management, 2003, 21 (6): 395-402.
Downloads
Published
Issue
Section
License

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

