Research on Roof Cutting and Pressure Relief Technology of Gob-side Entry Retaining with Hard Roof

Authors

  • Chao Hu

DOI:

https://doi.org/10.54097/x96gy394

Keywords:

Along the empty lane; Roof cutting and pressure releasing; Numerical simulation; Reinforcement support.

Abstract

Traditional coal pillar roadway protection is easy to cause roadway stress concentration, roadway deformation instability, and low recovery rate of coal resources. In order to solve the stability of roadway mining process and coal mine efficiency. Aiming at the problem of gob-side entry protection by deep hole pre-splitting blasting with hard roof, taking 1207 working face of Jiegou Coal Mine as the engineering background, through theoretical analysis, numerical simulation, field industrial test and other methods, the technology of roof cutting and pressure relief and constant resistance anchor cable reinforcement and roadway protection is put forward, and the key parameters such as appropriate roof cutting height and roof cutting angle are analyzed to achieve the effect of roof cutting and pressure relief, and the roadway reinforcement support scheme is designed. The field research shows that the roof cutting and roadway protection technology has a good control effect on 1207 working face roadway, realizes the safe production of working face, and provides certain reference value for this similar condition.

Downloads

Download data is not yet available.

References

[1] Qian Minggao, Xu Jialin, Wang Jiachen. Revisiting the Scientific Mining of Coal [J]. Coal Journal, 2018,43 (01) : 1-13.

[2] Zhao Gaoming, Tu Min, Zhang Xiangyang, et al. Study on roof cutting pressure relief angle of lateral structure of gob-side entry [J].Mining research and development, 2023,43 (02) : 108-115.

[3] He Manchao, Wu Yiyi, Gao Yubing, etc. Advances in rock mechanics of deep mining [J]. Coal Journal, 2024, 49 (01) : 75-99.

[4] Wang Qi, Zhang Peng, Jiang Zhenhua, et al. Method and verification of deep high-strength bolt-grouting roof cutting self-forming roadway [J].Coal Journal, 2021,46 (02) : 382-397.

[5] Kang Hongpu. 70 years of development and prospect of surrounding rock control technology of coal mine roadway in China [J]. Journal of Rock Mechanics and Engineering, 2021, 40 (01) : 1-30.

[6] Yang Fengcai, Wu Dongmei, Zhao Wei. Research and practice of roof cutting and pressure relief gob-side entry retaining technology [J].Energy and environmental protection, 2017,39 (09) : 82-87.

[7] Wang Hongsheng, Zhang Dongsheng, Li Shugang, Wang Lin, Wu Linzi. Determination of reasonable width of narrow coal pillar based on the location of fracture line B of key rock block of main roof [J]. Journal of Mining and Safety Engineering, 2014,31 (01) : 10-16.

[8] Chen Shangyuan, Zhao Fei, Wang Hongjian, etc. Research and engineering application of key parameters of deep roof cutting gob-side entry [J]. Geotechnical mechanics, 2019,40 (1) : 332-342,350.

[9] Zhang Dongsheng, Ma Liqiang, Feng Guangming, Miao Xiexing. In-situ filling gob-side entry retaining technology in fully-mechanized caving roadway [J].Journal of rock mechanics and engineering, 2005 (07) : 1164-1168.

Downloads

Published

08-12-2024

Issue

Section

Articles

How to Cite

Hu, C. (2024). Research on Roof Cutting and Pressure Relief Technology of Gob-side Entry Retaining with Hard Roof. Journal of Innovation and Development, 9(2), 74-80. https://doi.org/10.54097/x96gy394