Digital Collaboration and Supply Chain Resilience in Prefabricated Construction: A System Dynamics Case Study

Authors

  • Jueming Chen Dundee International Institute, Central South University, Changsha, China

DOI:

https://doi.org/10.54097/vmp07513

Keywords:

Digital Collaboration, Prefabricated Construction, Supply Chain Resilience, Project Delivery Stability, System Dynamics

Abstract

Prefabricated construction changes not the need for construction work, but the place and timing of much of that work. A considerable number of operations once completed on site are now organised through factory production. Taking the CSCEC Technology Shenzhen Changzhen Public Housing Project as the case, this paper studies the relationship among digital collaboration, supply chain resilience, and delivery stability in prefabricated building projects. Case evidence and system dynamics are used together. BIM application, smart construction platforms, component traceability, intelligent factories, and smart construction sites are first treated as observable practices in the project. They are then transformed into variables such as Digital Collaboration Level, Supply Chain Visibility, Cross-Stakeholder Collaborative Response Capability, Assembly Backlog, Cumulative Delay, and Supply Chain Resilience. Based on these variables, the paper develops causal loop diagrams and a stock-and-flow diagram. The results show that digital collaboration does not work as a simple, independent factor that raises delivery performance immediately. Its influence is first reflected in the information structure of the supply chain. When component status is easier to identify, stakeholders can respond more quickly, backlog can be controlled more effectively, and delay recovery can be shortened. In this way, digital collaboration contributes to stronger supply chain resilience and more stable project delivery. The paper explains this dynamic mechanism in the context of a large prefabricated housing project and provides a reference for collaborative supply chain management.

Downloads

Download data is not yet available.

References

[1] Vrijhoef R, & Koskela L. The four roles of supply chain management in construction. European Journal of Purchasing & Supply Management, 2000, 6(3-4): 169-178. DOI: https://doi.org/10.1016/S0969-7012(00)00013-7

[2] Yin X, Liu H, Chen Y, et al. Building information modelling for off-site construction: Review and future directions. Automation in Construction, 2019, 101: 72-91. DOI: https://doi.org/10.1016/j.autcon.2019.01.010

[3] Ivanov D, & Dolgui A. Viability of intertwined supply networks: Extending the supply chain resilience angles towards survivability. International Journal of Production Research, 2020, 58(10): 2904-2915. DOI: https://doi.org/10.1080/00207543.2020.1750727

[4] Hua Y Y, Zhang Y, Zhang S J, et al. Using building information modeling to enhance supply chain resilience in prefabricated buildings: A conceptual framework. Applied Sciences, 2023, 13(23): 12694. DOI: https://doi.org/10.3390/app132312694

[5] Qi Y Z, Li L H, & Kong F W. Research on the improvement path of prefabricated buildings' supply chain resilience based on structural equation modeling. Buildings, 2023, 13(11): 2801. DOI: https://doi.org/10.3390/buildings13112801

[6] Liu W, & Liu Z X. Simulation analysis of supply chain resilience of prefabricated building projects based on system dynamics. Buildings, 2023, 13(10): 2629. DOI: https://doi.org/10.3390/buildings13102629

[7] Lin M C, Ren Y F, Feng C, et al. Analyzing resilience influencing factors in the prefabricated building supply chain based on SEM-SD methodology. Scientific Reports, 2024, 14: 17393. DOI: https://doi.org/10.1038/s41598-024-65271-2

[8] Flyvbjerg B. Five misunderstandings about case-study research. Qualitative Inquiry, 2006, 12(2): 219-245. DOI: https://doi.org/10.1177/1077800405284363

[9] Sterman J D. Business Dynamics: Systems Thinking and Modeling for a Complex World. Boston: McGraw-Hill, 2000.

[10] China State Construction Engineering Corporation. The largest prefabricated public housing project in China has been delivered and occupied. China State Construction Engineering Corporation, 2023-05-25.

[11] Cheng Z, Tang S, Liu H, & Lei Z. Digital technologies in offsite and prefabricated construction: Theories and applications. Buildings, 2023, 13(1): 163. DOI: https://doi.org/10.3390/buildings13010163

[12] China Construction Science and Technology Group Co., Ltd. Remote observation meeting of intelligent construction pilot project held in Shenzhen Changzhen public housing. China Construction Science and Technology Group Co., Ltd., 2023-01-09.

[13] Bortolini R, Formoso C T, & Viana D D. Site logistics planning and control for engineer-to-order prefabricated building systems using BIM 4D modeling. Automation in Construction, 2019, 98: 248-264. DOI: https://doi.org/10.1016/j.autcon.2018.11.031