Prefabricated Component Production Scheduling Optimization Using Simulated Annealing
DOI:
https://doi.org/10.54097/jjtsmk12Keywords:
Prefabricated Components; Simulated Annealing; Production Scheduling; Combinatorial Optimization; Makespan.Abstract
With the rise of assembled buildings, precast concrete components have become the focus of the industry, and their production scheduling as a key link to the healthy and green development of the industry plays a crucial role. Nowadays, with the diverse demands of the construction market, the production of components is characterised by multiple varieties and small batches, and covers multiple closely related processes from raw material supply to maintenance and demoulding, facing complex scheduling dilemmas, and the problems of rationally allocating the processing sequence of the workpieces, improving the utilisation rate of the equipment, and shortening the production cycle still exist. This study shows that on the premise of ensuring that the proposed production scheduling model meets the needs of the assembly construction site, using the calculation results of the simulated annealing method, the rational planning of the production sequence of the components and the allocation of resources can significantly reduce the completion time of the prefabricated components and improve their production efficiency.
References
[1] Chan W T, Hu H. Production Scheduling for Precast Plants using a Flow Shop Sequencing Model[J]. Journal of Computing in Civil Engineering,2002,16(3):165-174.
[2] Benjaoran V, Dawood N. Intelligence approach to production planning system for bespoke precast concrete products[J]. Automation in Construction, 2006, 15(6): 737-745.
[3] Phanden K R, Gupta S, Wolde B, et al. Optimisation of job shop scheduling problem using genetic algorithm and simulated annealing: a case study of manufacturing industry[J]. International Journal of System Assurance Engineering and Management, 2025, (prepublish): 1-10.
[4] Zhang Z, Fu Y, Gao K, et al. A cooperative evolutionary algorithm with simulated annealing for integrated scheduling of distributed flexible job shops and distribution[J]. Swarm and Evolutionary Computation,2024,85101467-.
[5] D.S. Yang. Solving production scheduling problems with simulated annealing algorithm[J]. Journal of Huanggang Normal College, 2004, 24(3): 45-47.
[6] Jing Huicheng, Wang Ying. Simulated annealing algorithm to optimize PSO-GA algorithm to solve flexible flow shop scheduling problem[J]. Small Microcomputer Systems, 2020, 41(5): 996-999.
[7] Yang Rongzheng, XU Shuangshuang, XIAO Yao, et al. Research on prefabricated component production scheduling optimization under flow constraint[J]. Project Management Technology, 2024, 22(10): 52-59.
[8] Li Binbin. Research on multi-objective production job scheduling based on genetic algorithm[D]. Donghua University, 2014.
[9] Wang Ru, Ban Danmei, Wang Yue,e t al. Research on production scheduling problem of precast concrete components considering resource constraints[J]. Manufacturing Automation, 2020, 42(12): 63-67.
[10] Ban Danmei. Research on production optimization method of precast concrete components for assembled buildings[D]. Xi'an University of Architecture and Technology,2020.
[11] Shen Chunya, Fang Liao Liao, Peng Laihu, et al. Adaptive simulated annealing algorithm-based scheduling model for warp preparation workshop[J]. Textile Journal,2024, 45(3): 81-86.
[12] Ji Suning, Cao Jingsheng, Liu Shijiang, et al. Research on obstacle avoidance path planning based on improved artificial potential field method[J]. Modern Electronic Technology, 2025, 48(01): 117-122.
[13] Tian Dongping, Chi Hongqin. Hybrid genetic algorithm and simulated annealing method[J]. Computer Engineering and Applications, 2006, 42(22): 63-65.
[14] Guona Main, Xiaoping Tang. Research on rural emergency logistics distribution path based on simulated annealing method and Floyd optimization algorithm[J]. Software Engineering, 2022, 25(12): 9-12+8.
[15] Wang Bailin, Wang Haifeng, LI Tieke. Finite-wait replacement flow shop scheduling algorithm with rejectable workpieces[J]. Control and Decision Making, 2019, 34(03): 459-469.
Downloads
Published
Issue
Section
License
Copyright (c) 2025 Yurui Yuan, Junyong Liang, Ziwei Wu, Yingmei Liao

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.







