Construction of an Assessment Model for Project Risk Management Effectiveness Based on Statistics
DOI:
https://doi.org/10.54097/zhxagt56Keywords:
Project risk management; Statistical methods; Multiple regression analysis model; Assessment model.Abstract
With the increase of project complexity, the traditional risk management methods can no longer meet the actual needs, so it is particularly important to develop a more scientific, objective and practical assessment model. The purpose of this article is to discuss the construction and application of project risk management effect assessment model based on statistics. In order to achieve this goal, this article adopts a variety of statistical methods, including data collection and pretreatment, model selection and design. Through extensive collection of project risk management related data and strict pretreatment, this article ensures the quality and consistency of data. On this basis, this article constructs an assessment model based on multiple regression analysis to capture the complexity of risk management effect more comprehensively. The experimental results show that the model is excellent in accuracy, objectivity and practicability. This model not only helps to improve the effect of project risk management, but also provides strong support for the follow-up research and application.
Downloads
References
[1] Shen Zhong, Li Xingmei, Zhao Qiuhong. Project Portfolio Decision-Making under the Influence of Financing Risk [J]. Journal of Systems Engineering, 2024, 39(1): 146-160.
[2] Wang Xiaosheng, An Xiaojie, Guo Haiying. Investment Risk Analysis of Benefit-Sharing Contract Water Saving Management Projects [J]. Chinese Journal of Management Science, 2023, 31(9): 196-204.
[3] Zhang Xu, Bai Sijun, Wang Zonghan, et al. A Model for Selecting Risk Response Strategies for Strategically Oriented Project Portfolios [J]. Operations Research and Management Science, 2024, 33(4): 118-124.
[4] Li Ruimeng, Yang Naiding, Liu Hui, et al. A Risk Propagation Model for Design Changes in Complex Product Development Projects Considering Organizational Failures and Coordination [J]. Chinese Journal of Management Science, 2022, 30(10): 265-276.
[5] Wang Yuru, An Yuhua. Risk Assessment of EPC Project Construction Phase Based on Matter-Element Extension Model [J]. Journal of Engineering Management, 2023, 37(3): 102-107.
[6] Yu Hongliang, Chen Jialuo. Research on Risk Chain of Green Building Projects under EPC Mode Based on SEM [J]. Science and Technology Management Research, 2021, 41(17): 199-205.
[7] Zhao Xuelei, Li Yongxin. Application of Risk Matrix in Project Management [J]. China Foundry Equipment & Technology, 2023, 58(2): 94-97.
[8] Chen Liwen, Li Xuejing, Wang Zhen. Research on Risk Hierarchy and Transmission Paths of Existing Public Building Energy-Saving Renovation Projects Based on FISM [J]. Journal of Civil Engineering and Management, 2021, 38(4): 155-162.
[9] Li Qiangnian, Wang Qiaoqiao. Research on Vulnerability Risk Paths of Prefabricated Commercial Residential Projects Based on SEM [J]. Journal of Civil Engineering and Management, 2021, 38(4): 195-201.
[10] Huang Dechun, Feng Tongzu. Research on Social Stability Risk Early Warning for Megaprojects Based on Multivariate Interest Conflicts [J]. Science and Technology Management Research, 2020, 40(15): 224-230.
Downloads
Published
Issue
Section
License

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.