Financial and Development Analysis of Y Architectural Design Company
DOI:
https://doi.org/10.54097/hbem.v10i.8040Keywords:
Financial analysis; Liquidity crisis; Industrial chain; Three red lines policy.Abstract
On 22 September 2022, UA Design, a privately listed design institute, announced that it intended to restructure its debt in the form of housing against debt with some real estate companies. Based on this event, this study collected and analyzed UA Design's financial data in an attempt to find out the reasons for the growth of its accounts receivable and to get a glimpse of the industry's development dilemma. The case study of UA Design and its associated real estate company, Greenland Holding Group Co., Ltd. reveals that the increase in accounts receivable is closely related to the liquidity risk of the real estate industry, which has been exposed to policy factors such as the three red lines. Various real estate companies are using deferred payment methods such as commercial paper to minimise the blockage of financing due to the touching of the "three red lines", which manifests itself at the design institute level in the form of defaulted design fees. In response to this situation, this study has accordingly made recommendations from the perspectives of human resources and technical management, and has proposed that policies such as the three red lines are beneficial to the long-term development of design institutes.
Downloads
References
Salvatierra, J. L., Gálvez, M. Á., Bastías, F., Castillo, T., Herrera, R. F., & Alarcón, L. F. (2019). Developing a benchmarking system for architecture design firms. Engineering, Construction and Architectural Management.
Oluwatayo, A. A.. (2011). Architectural firms: workforce, business strategy and performance. Australasian Journal of Construction Economics and Building, 11(4), 21-44.
Oyedele, L. O. (2013). Analysis of architects' demotivating factors in design firms. International Journal of Project Management, 31(3), 342-354.
Rounce, G.. (1998). Quality, waste and cost considerations in architectural building design management. International Journal of Project Management, 16(2), 123-127.
Yang Youxiao. (2020). Motivation and Effect Analysis of Assets-backed Notes Financing of Accounts Receivable in Construction Industry——Case Study of China Construction Third Bureau Group Co., Ltd. (Master's Thesis, Southwestern University of Finance and Economics). https://kns.cnki.net/KCMS/detail/detail.aspx?dbname=CMFD202202&filename=1020372098.nh
Gerasimova, L.. (2021). Accounting and analytical mechanism for managing accounts receivable in construction. Auditor, 7(2), 39-50.
Huang, Wenchao. (2021). Real estate enterprises in the "three red lines" under the influence of financial management measures to explore. Accounting Learning (36),19-21.
Guo Gang. (2022). Can't fall before the dawn - Analysis of the development situation of the architectural design industry. China Engineering Consulting (05),58-61.
Lu, Yuanqiang. (2020). Thoughts on the Business Transformation of Small and Medium-sized Design Institutes. China Well and Rock Salt (04),41-43.
Uchehara, I., Hamma-Adama, M., Obiri, K. A., Jafarifar, N., & Moore, D. (2020). Impacts and risk management of COVID-19 pandemic on real estate supply chain. International journal of real estate studies, 14(S1), 41-53.
Downloads
Published
Issue
Section
License

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.






