Analysis and Experimental Research on Water Control Performance of Integrated Water Control Fracturing Completion Tools

Authors

  • Yulin Zhang
  • Ningning Wang
  • Hai Yang
  • Wan Wen
  • Man Chen

DOI:

https://doi.org/10.54097/qs9hdm90

Keywords:

Water Control - Fracturing Completion Tools; Numerical simulation; Overcurrent pressure drop; On site application.

Abstract

This paper proposes a swirl type water control device to address technical challenges such as gas well formation water output and multi-stage segmented fracturing of long horizontal wells. The geometric and grid models of the fluid region of the water control device are extracted and established. The distribution law of the flow pressure drop of methane gas and pure water passing through the device is analyzed through numerical simulation. The simulation results show that under the same flow rate, the pressure drop of pure water is about 140 times that of methane gas, indicating that the swirl type water control device has a much greater limiting effect on water flow than methane gas; At the same inlet pressure, the production of methane gas is about forty times that of water, indicating that the swirl water control device has a good effect on controlling water gas. At the same time, a set of integrated water control fracturing completion tools was designed, which can directly perform fracturing operations after lowering the pipe column. After fracturing is completed, natural gas production operations can be carried out directly without the need for other auxiliary tools to be lowered. This integrated water control fracturing tool has been applied to 6 gas wells in Changning, significantly improving on-site operational efficiency. The results of this study provide a new and efficient tool for solving the problems of segmented fracturing and water production in gas wells.

Downloads

Download data is not yet available.

References

Yu G, Li H, et al. Prediction of the growth trend of natural gas reserves in the Sichuan Basin based on a multi cycle model [J]. Natural Gas Exploration and Development, 2021, Volume 44 (1): 30-37.

Li J, Tian L, et al. Research on gas lift and liquid discharge models for tight sandstone water producing gas wells [J]. Science and Technology and Engineering, 2023, Volume 23 (12): 5041-5047.

Jiang H. Optimization and Application of Continuous Tubing Production Technology for Water producing Gas Wells in Tight Sandstone Gas Reservoirs [J]. Natural Gas Exploration and Development, 2022, Volume 45 (2): 99-107.

Zhang L, Luo C, et al. Research Progress in Gas Well Liquid Accumulation Prediction [J]. Natural Gas Industry, 2019, Volume 39 (1): 57-63.

Wang, YW, Liu, HQ, Chen, et al. A visualized investigation on the mechanisms of anti-water coning process using nitrogen injection in horizontal wells(Article)[J].Journal of Petroleum Science and Engineering,2018,Vol.166: 636-649.

Zeng, QS, et al. "A novel oil–water separator design and its performance prediction." Journal of Petroleum Science and Engineering 145 (2016): 83-94..

Sun X, Bai B. Research Status of Horizontal Well Water Control Technology at Home and Abroad [J]. Petroleum Exploration and Development, 2017, Volume 44 (6): 967-973.

Delamaide, Eric, et al. "Pelican Lake field: first successful application of polymer flooding in a heavy-oil reservoir." SPE Reservoir Evaluation & Engineering 17.03 (2014): 340-354.

Wang, J, et al. "Mechanism and sensitivity analysis of an inflow control devices (ICDs) for reducing water production in heterogeneous oil reservoir with bottom water." Journal of Petroleum Science and Engineering 146 (2016): 971-982.

Yue, p, et al. "A coupling model of water breakthrough time for a multilateral horizontal well in a bottom water-drive reservoir." Journal of Petroleum Science and Engineering 177 (2019): 317-330.

Yang, Mingjun, et al. "Numerical Modelling for the Optimum Design of Horizontal Well Completions with PSCs in Water Drive Reservoirs." Arabian Journal for Science and Engineering 44 (2019): 5215-5232.

Birchenko, V. M., K. M. Muradov, and D. R. Davies. "Reduction of the horizontal well's heel–toe effect with inflow control devices." Journal of Petroleum Science and Engineering 75.1-2 (2010): 244-250.

Zhao H, Tian J, et al. Development Status of Horizontal Well Water Control Devices [J]. Petroleum Mining Machinery, 2017, Volume 46 (1): 81-85.

Zhao, Lin, Quanshu Zeng, and Zhiming Wang. "Design and performance of a novel autonomous inflow control device." Energy & fuels 32.1 (2018): 125-131.

Li Y, Hu P, et al. Background, Current Situation, and Development Trends of Water Blocking in Horizontal Wells [J]. Journal of Petroleum and Natural Gas, 2005, (205): 757-760.

Jia P, Xue S, et al. Optimization of Water Control Performance and Structural Parameters of Floating Plate Adaptive Flow Control Device [J]. Journal of China University of Petroleum, 2021, 45(5).

Michael, Konopczynski, Ajayi Arashi, and WellDynamics Inc. "Design of Intelligent Well Downhole Valves for Adjustable Flow Control." 2004.

Williamson, Jim R., Brett Bouldin, and Dan Purkis. "An Infinitely Variable Choke for Multi-Zone Intelligent Well Completions." SPE Asia Pacific Oil and Gas Conference and Exhibition. SPE, 2000.

Downloads

Published

21-05-2024

Issue

Section

Articles