Application of BIM in the Refined Management of Prefabricated Building Design Phase
DOI:
https://doi.org/10.54097/v4031382Keywords:
BIM technology, prefabricated buildings, collaborative design, prefabricated component library, engineering quantity calculation.Abstract
This thesis will explore the application mechanism of BIM technology in the design phase of prefabricated buildings, focusing on the construction of standardized prefabricated component libraries, efficient multidisciplinary collaborative design, intelligent clash detection, professional detailed design and accurate engineering quantity calculation. By integrating theoretical analysis with typical engineering case studies, this paper analyzes the core advantages of BIM applied in prefabricated building design, including shortened project cycles, enhanced design refinement and remarkable cost reduction. The research demonstrates that compared with conventional design modes, BIM can effectively address major pain points in prefabricated building design. It provides reliable technical support for improving design efficiency and engineering quality, and presents great potential for accelerating the sustainable and standardized development of prefabricated architecture in China’s construction industry.
Downloads
References
[1] Q. Ting, L. Liu, L. Chen, D. Qin, S. Li, Application of Integration of Transfer Learning and BIM Technology in Prefabricated Building Design Optimization. Buildings, 15(17) (2025). https://doi.org/10.3390/BUILDINGS15173029
[2] R. Li, The Impact of Prefabricated Construction on Traditional Design Content and Processes. JINSS. 2(2) (2025). https://doi.org/10.62639/SSPJINSS14.20250202
[3] X. Wu, Development and Practical Exploration of Prefabricated Buildings from a Green Environmental Perspective. AJAGE. (2024)
[4] T. Tan, K. Chen, F. Xue, W. Lu, Barriers to Building Information Modeling (BIM) Implementation in China's Prefabricated Construction: An Interpretive Structural Modeling (ISM) Approach. J. Clean. Prod. 219, 949–959 (2019)
[5] Y. Xiao, J. Bhola, Design and Optimization of Prefabricated Building System Based on BIM Technology. INT J SYST ASSUR ENG. 13, 1–10 (2021)
[6] B. Yang, T. Fang, X. Luo, B. Liu, M. Dong, A BIM-Based Approach to Automated Prefabricated Building Construction Site Layout Planning. KSCE J. Civ. Eng. 26, 1–18 (2021)
[7] X. Huang, Research on the Application of BIM Technology in Building Construction. Research on Urban Construction Theory, 12, 133–135 (2025)
[8] Q. Wan, Research on Whole-Process Cost Management of Construction Projects Based on BIM. Master Thesis, East China Jiaotong University, Structural Engineering (2026)
[9] J. Sun, Z. Li, F. Xiao, J. Xiao, Generation of Typical Meteorological Year for Integrated Climate-Based Daylight Modeling and Building Energy Simulation. Renew. Energy (2020)
[10] C. Yang, F. Xiong, Q. Hu, R. Liu, S. Li, Incentive Mechanism of BIM Application in Prefabricated Buildings Based on Evolutionary Game Analysis. Buildings (2023)
Downloads
Published
Issue
Section
License
Copyright (c) 2026 Academic Journal of Science and Technology

This work is licensed under a Creative Commons Attribution 4.0 International License.








