Systematic Optimization of Enterprise Process and Progress Management: From Fragmented Execution to Intelligent Collaboration

Authors

  • Lei Liang
  • Peng Cheng
  • Jianpeng Fan

DOI:

https://doi.org/10.54097/x7stjq46

Keywords:

Three-layer process optimization, Agile progress control, Intelligent collaboration

Abstract

In complex project management, the coordinated optimization of process and schedule management has become the core engine for improving engineering efficiency. Research shows that enterprises are currently facing the three dilemmas of process fragmentation, schedule black box and organizational collaboration fragmentation, which leads to cost overruns due to delayed progress feedback. This paper constructs a "three-layer process optimization + agile schedule control" system, implements technology, organization and system innovation simultaneously, forms a digital circuit with neuroplasticity, enables the management system to continuously evolve like a living organism, and supports engineering projects to achieve efficient delivery and controllable risks.

Downloads

Download data is not yet available.

References

[1] Harold Kerzner. Project Management: A Systematic Approach to Planning, Scheduling and Control [M]. Published by Electronic Industry Press, 2018.

[2] Al-Tmeemy S, Al Bassam B. An empirical analysis of the relationship between cost of control activities and project management success [C]. MATEC Web of Conferences, 2018. DOI: https://doi.org/10.1051/matecconf/201816202036

[3] Cajzek, Rok, Klansek, Uros. Cost Optimization of project schedules under constrained resources and alternative production processes by mixed-integer nonlinear programming [J]. Engineering construction and architectural management, 2019, 26(10):2474-2508. DOI: https://doi.org/10.1108/ECAM-01-2019-0013

[4] Milani F, Kubrak K, Nava J. Strategic redesign of business processes in the digital age: A framework [J]. Data & Knowledge Engineering, 2024, (154);102367. DOI: https://doi.org/10.1016/j.datak.2024.102367

Downloads

Published

11-06-2025

Issue

Section

Articles

How to Cite

Liang, L., Cheng, P., & Fan, J. (2025). Systematic Optimization of Enterprise Process and Progress Management: From Fragmented Execution to Intelligent Collaboration. Frontiers in Business, Economics and Management, 19(3), 99-102. https://doi.org/10.54097/x7stjq46