Abstract

This article aims to optimize the safety measures of the special plan and proposes a Bayesian network method for modeling the safety risks of construction sites based on construction site information. It transforms the optimization problem of safety measures into a dynamic combination problem of safety measures and introduces a genetic algorithm to solve this combination optimization problem. Improving the safety level of the subway construction site has reduced the construction risk factors.

Downloads

Download data is not yet available.

References

[1] Zhang Y, Ding L, Love PED. Planning of Deep Foundation Construction Technical Specifications Using Improved Case-Based Reasoning with Weighted k-Nearest Neighbors. Journal of Computing in Civil Engineering. 2017, 31(5):04017029.

[2] Thomas, H.R. & Ellis Jr, R. D. Contractor prebid planning principles. Journal of construction engineering and management,2007,133(8),542-552.

[3] Menches, C. L., & Hanna, A. S. Conceptual planning process for electrical construction. Journal of construction engineering and management. 2006,132(12), 1306-1313.

[4] Menches, C. L., Hanna, A. S., Nordheim, E. V. et al. Impact of pre-construction planning and project characteristics on performance in the US electrical construction industry. Construction Management and Economics. 2008,26(8),855-869.

[5] Barnard Yvonne, Blok Inger. Gathering user needs for knowledge management applications for engineers in advanced manufacturing industries. Conference Proceedings of the & th International Conference on Human Aspects of Advanced Manufacturing. Rome: National Research Council of Italy, Institute of Cognitive Sciencesand Technologies, 2003. 339-346.

[6] Hu X, Xia B, Skitmore M, et al. The application of case-based reasoning inconstruction management research: An overview. Automation in Construction.2016,72:65-74.

[7] Ryu H G Lee H S, Park M. Construction planning method using case-based reasoning (CONPLA-CBR). Journal of computing in civil engineering, 2007,21(6):410-422.

[8] Aamodt A, Plaza E. Case-based reasoning: Foundational issues, methodological variations, and system approaches. AI communications, 1994, 7(1): 39-59.

[9] Prentzas J, Hatzilygeroudis I. Categorizing approaches combining rule-based and case-based reasoning. Expert Systems, 2007, (24):97-122.

[10] Deepti Anne John, Rose Rani John. A Framework for medical diagnosis using hybrid reasoning in: Proc. International MultiConference of Engineers and Computer Scientists, 2010, Vol I: 157-160.

Downloads

Published

28-04-2025

Issue

Section

Articles

How to Cite

Wei, Z., & Tong , S. (2025). Research on Deepening and Optimizing the Special Plan for Deep Excavation Based on Subway Engineering Site Information. International Journal of Energy, 6(3), 73-78. https://doi.org/10.54097/nv5qkm24