Comparison of Route Selection Schemes of Dong Tianshan Tunnel based on Geological Analysis

Authors

  • Xuejun Liu
  • Chao Liu
  • Yanjun Li
  • Jingzhen Chen
  • Jingyao Li

DOI:

https://doi.org/10.54097/0tbrph90

Keywords:

Dong Tianshan Tunnel, Engineering Geological Conditions, Surrounding Rock, Adverse Geological

Abstract

Based on the understanding of the engineering geological conditions in the tunnel site area of the Dong Tianshan Tunnel and the summary of engineering practice, an engineering geological route selection method for the Dong Tianshan Tunnel is proposed. Focused on the research and analysis of the engineering geological conditions and surrounding rock geological conditions and classifications related to the various line schemes of the tunnel section. And on this basis, analyze the situation of the two lines from the tunnel length, surrounding rock conditions, water gushing, unfavorable geological conditions and so on. Considering the stability of the opening and the construction safety of the cave body, the recommended scheme K is less risky than scheme B, and is safer and more reasonable.

Downloads

Download data is not yet available.

References

[1] Wu Xuezhi, Zhang Shaohui, Wang Jian, et al. Test Design and Construction Techniques for the Collapse Treatment of a Tunnel with an Extra-Large Section[J]. Modern Tunnelling Technology,2016,53(4):148-153+171.

[2] Yan Jinxiu. Technical Challenges of Super-long Mountainous Tunnels at Great Depth[J]. Modern Tunnelling Technology,2018,55(3):1-5.

[3] Xu Zemin, Huang Rungiu. Deep-Buried Extra-Long Tunnel and the Geological Disaster during Construction [M]. Chengdu: Southwest Jiaotong University Press,2000.

[4] Xu Laibao, Xu Can, Tang Yuchun. On the Tunnel through Complex Formation Collapse Treatment Measures and Methods[J]Highway Engineering.2012,37 (2):118-122.

[5] Zhan Jinwu, Liu Guo, Huang Ming, etc. Study on Risk Assessment Model and System of Mountain Tunnel Collapse[J]. Journal of Underground Space and Engineering,2022,18(04):1338-1346+1362.

[6] Gao Hongtao. Safety Evaluation of Primary Support Structure during Collapse Treating of Large Cross-section Railway Tunnel[J]Tunnel Construction,2016,36(6):756-761.

[7] Xu Youding. Principles for Selecting Tunnel Route Schemes [J]. China Survey and Design,2007, No.181(10):62-64.

[8] Deng Suqin et al. Study on Line Location Comparison Based on Risk Assessment of Karst Water Inrush in Tunnel-A Case Study of Hefeng-Xuan'en Section of Yifu Railway[J]. Safety and Environmental Engineering,2023,30(02):68-78.

[9] Yan Lilai. The Experience of Tunnel Geological Line Selection Design for Mountainous Highway[J]. Shanxi Science & Technology of Communications,2016, No.238(01):40-43.

[10] Cao Huaping, Wang Ke. Study on Geological Route Selection for Railway Tunnel Engineering in Carst Zone[J]. High Speed Railway Technology,2011,2(01):31-36.

[11] Ma Tao. Route Selection of Highway Tunnel Route [J]. Highway, 2014,59 (05): 99-101.

[12] Yin Hang. A Study on Route Selection of Maluging Tunnel of Shanghai-Chongqing-Chengdu High-speed Railway (Yichang-Fuling Section) [J]. High Speed Railway Technology,2023,14(01):106-110.

[13] China Communications First Highway Survey, Design and Research Institute Co., Ltd . Code for Highway Engineering Geological Investigation [S]. Beijing: People's Communications Press,2011. (inChinese)

Downloads

Published

28-04-2025

Issue

Section

Articles

How to Cite

Liu, X., Liu, C., Li, Y., Chen, J., & Li, J. (2025). Comparison of Route Selection Schemes of Dong Tianshan Tunnel based on Geological Analysis. International Journal of Energy, 6(3), 118-123. https://doi.org/10.54097/0tbrph90