Design of boom expansion principle and luffing system of side - mounted tower crane
DOI:
https://doi.org/10.54097/hset.v71i.13072Keywords:
Side-mounted; Erection principle; Swing rope system Introduction.Abstract
In order to ensure normal movement and avoid interference in the erection and recovery process of the side-mounted rapid erection tower crane, our takes it as the research object, analyzes the structure composition and erection working principle of the boom part of the quick erection tower, and uses SolidWorks three-dimensional simulation to complete the drawing of different structure models of the tower crane. At the same time, the design of steel wire rope system is being studied, which provides a theoretical basis for the design of this kind of side-mounted tower crane.
Downloads
References
G. P. Ghen, W. L. Luo, Y. Z. Guo, and X. Zheng, “Boom packing and stretching device of erected tower crane with three arms,” Design & Research, vol. 35, pp. 45-46+54, July 2014.
C. W. Tian, and et al, “Dynamic Analysis of fast frame tower crane boom folding process,” Design & Research, vol. 36, pp. 39-41, June 2015.
X. H. Li, and X. F. Li, “Structural Design of Jib of Folding Boom Truck Crane,” Modern manufacturing technology and equipment, vol. 58, pp. 42-46, April 2022.
B. Lin, M. Zhai, “Design of variable amplitude steel wire rope system for fast erection of tower crane,” DESIGN & CALCULATION, vol. 498, pp. 64-69, August 2017.
T. Huang, “Dynamic analysis of boom folding process of fast tower crane,” South forum, vol. 49, pp. 39, September 2018.
C. R. GAO, and et al, “Multi-Objective Optimization of Variable Amplitude System for Mixing-Jib Overhead Working Truck,” Machinery Design & Manufacture, vol. 341, pp. 201-205+209, July 2019.
Downloads
Published
Issue
Section
License

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.