Drilling scheme analysis and output prediction of instrumented wheel-set based on Finite Element Method and LSTM
DOI:
https://doi.org/10.54097/hset.v27i.3847Keywords:
Instrumented wheel-set, finite element analysis, drilling scheme, LSTM neural networkAbstract
Based on the Finite Element Method and wheel-rail force measurement theory, the effects of different drilling schemes and parameters on the output of the measuring electrical bridge are analyzed, and the optimal parameters are determined. The finite element model of a metro instrumented wheel-set is established by software ABAQUS. The effects of drilling radius, hole size and wheel-rail contact point on the strain of measuring points are calculated and analyzed, and the measuring bridge outputs of two different drilling schemes are compared. The output of the wheel-rail forces is predicted based on LSTM long short memory network. The results show that: (1) the optimal drilling position is on the middle surface of the wheel, (2) The drilling scheme of eight-hole is better than that of four-hole, (3) LSTM neural network can realize decoupling of bridge signal and high precision prediction of wheel-rail forces.
Downloads
References
Chen Chengyuan, Shi Yan. Instrumented wheel-settechnique for continuous meaurement of wheel/rail loads[J]. Journal of southwest jiaotong university, 1994, 29(3):263-267.
Wu Duo, Luo HongKui. Using Iterative Method to Process the Data Measured by Instrument Wheelset[J]. China Railway Science, 1994, 29(3):263-267.
Zeng Yuqing, Wang Weidong, Gan Dunwen. Theory of High Accuracy Load Measuring Wheelset[J]. Journal of the China Railway Society,1998, (6):28.
Liu Shangju, Jin Xuesong, Zhang Limin.Research for Improving the Measurement Accuracy of the Instrumented Wheelset[J]. Rolling Stock,1998(02):32-34.
SHAO Yuping, CHEN Jianzheng. Application Study on BP Neural Network Applied to Calculation about a Instrumented wheel-setwith Horizontal and Vertical Bridge Combination[J]. Railway Locomotive & Car, 2003, 29(5):36-38.
Chang Chongyi, Wang Chengguo, Li Lan. Study on Numerical Test of Instrumented wheel-setfor Continuous Measurement[J]. Railway Locomotive & Car, 2007, 27(5): 3-5.
Zuo Tengjie, Liu Yangchun. Development of Wheel Load and Lateral Force Measurement Processing System Combining Intermittent and Continuous Measurement Methods[J]. Foreign Rolling Stock, 2010(01):32-37.
Chu Gaofeng, Li Gu, Zu Honglin. Finite Element Analysis on the Instrumented wheel-setof High Speed EMU[J]. Railway Locomotive & Car,2011, 31(1):90-93.
Chen Shuangxi, Lin Jianhui, Chen Jianzheng. Comparison of electrical bridge behaviors of an instrumented wheel-setbased on improved EMD and FEM[J]. Journal of vibration and shock, 2012, 31(6): 131-135.
Bagheri V R, Tehrani P H, Younesian D. Optimal strain gauge placement in instrumented wheel-setfor measuring wheel-rail contact forces[J]. International Journal of Precision Engineering and Manufacturing, 2017, 18(11):1519-1527.
Su Jianqiu, Chen Jianzheng. Wheel/rail force calculation based on UKF-KF[J]. Electronic Measurement Technology, 2018(14): 55-58.
HOCHREITER S, SCHMIDHUBER J. Long Short-term Memory [J]. Neural Computation,1997,9(8): 1735-1780.
Lei Jinhao, Liu Chao, JIANG Dongxiang. Fault Diagnosis of Wind Turbine Based on Long Short-term Memory Networks [J]. Renewable Energy, 2019, 133: 422-432.
Downloads
Published
Issue
Section
License

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.







