Problems in the Whole Process of Management and Control of Construction Cost and Cost Management Strategies
DOI:
https://doi.org/10.54097/hset.v28i.4107Keywords:
Management and control of construction cost; Problems; Cost management strategies.Abstract
In the project construction process, the cost level directly affects the investment benefit of the project. In order to ensure the overall quality and management level of construction projects, construction enterprises need to actively improve and innovate cost management and maximize the quality of cost management. This paper expounds on the research background of the whole cost management process, analyzes the influencing factors of the current project cost management, and finally puts forward specific cost management strategies for different stages to promote the improvement of China's project cost management level. Currently, problems in the whole process of management and control of construction cost include unreasonable preparation of project cost budget, inadequate budget consideration, and inadequate process control of project cost. This paper finally conducts cost control through detailed management, BIM technology, dynamic control decision-making and other methods, and adjusts the control process through investigation and research on different stages of decision-making.
Downloads
References
Prabhakar G P. Projects and Their Management: A Literature Review Int. J. Business and Management 2008, 3: 3
S Li. Research on the characteristics of construction project cost and the implementation method of dynamic control. Value Engineering, 2019, 38 (6): 12-14
W. Lu, Y. Hua, and S. Zhang, logistic regression analysis for factors influencing cost performance of design-bid-build and design-build projects. Engineering, Construction and Architectural Management, 2017, 24(1): 118-132,
S. L. Chan and M. Park, project cost estimation using principal component regression, Construction Management and Economics, 2005, 23(3): 295-304,
J. Kujala, T. Brady, and J. Putila, Challenges of cost management in complex projects, International Journal of Business and Management, 2014, 9(11): 48-57.
C Mei. Discussion on Management and Control of Construction Cost. Residential and Real Estate, 2020, (3): 41
J. Rodriguez, Construction Contracting: All about Cost-Plus Contract, The Balance, London, UK, 2017.
N. J. Lavingia, Improve profitability through effective project management and TCM, Cost Engineering, 2003, 45(11): 22-24
X. H. Jin, H. Doloi, and S. Y. Gao, relationship-based determinants of building project performance in China, Construction Management and Economics, 2007, 25(3): 297-304
Sovacool B K, Gilnert A and Nugent D 2014 An International Comparative Assessment of Construction Cost Overruns for Electricity Infrastructure Energy Research & Social Science 3 152
J Ping, L Wen. Analysis of cost control countermeasures in the whole process of construction project management under PPP mode. Jushe, 2021 (25): 127-128
Memon A H, Rahman I A, Abdullah M R and Aziz A A A 2010 Factors Affecting Construction Cost in Mara Large Construction Project: Perspective of Project Management Consultant Int. J. Sus. Const. Eng. Tech. 1 41
G Yan, H Feng. Research on Problems and Countermeasures in Real Estate Project Cost Management. Engineering Construction and Design, 2019 (20)
L Qin. Analysis of dynamic management and control points of construction cost. Building Technology Development, 2020, 47 (3): 113-115
Z Yi. Analysis on Dynamic Management and Control Measures of Construction Cost. Technology and Enterprise, 2015, (23): 50, 53
Z Wan. Analysis on the risk prevention strategy of construction project cost under EPC mode Residential industry, 2021, (9): 104-105
H Jin. Analysis on Control and Management of Total Cost Budget and Final Account in Construction Engineering. Real Estate World, 2021, (18): 35-37
J Jing. Analysis of cost control countermeasures in the whole process of construction project management. Chinese Building Metal Structure, 2022, (01): 144-145
Downloads
Published
Issue
Section
License

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.