Design of a Five-story Brick-concrete Structure Building Demolition Scheme by Folding Blasting
DOI:
https://doi.org/10.54097/ajst.v7i2.12252Keywords:
5-story brick concrete structure building, Folding blasting, Demolition plan.Abstract
There are several schemes for controlled blasting demolition of buildings, including in-situ collapse, inward collapse, directional collapse, unidirectional collapse, and bidirectional collapse. The choice of blasting plan is mainly influenced by the structure and geometric size of the explosive, the surrounding environment, and the initiating equipment. This article designs a folding blasting demolition plan for a 5-story brick concrete structure building. Based on the structural dimensions of the building to be demolished and the surrounding environmental map. Only the south side of the building is relatively open and can provide a site for the collapse of the building, so the directional dumping blasting plan towards the south is chosen. Adopting a comprehensive protective system to eliminate or minimize blasting hazards as much as possible. This blasting adopts a hybrid blasting network with electric detonators detonating non electric detonators. Each blasting hole has one detonator, which is connected with one segment of detonator inside the hole and one segment of detonator outside the hole. After every 20 detonators are clustered together, they are connected to a double detonator to form a connection point, and then the connection points are double connected to form a blasting network.
Downloads
References
Fu-You L, Yun-Mao W, Cheng-Min L,et al.Application of zone delay technology in blasting of brick-concrete structure building[J].Engineering Blasting, 2022, 12(4):31-36.
Hidayat B A, Hu H T, Hsiao F P,et al.Seismic behavior and failure modes of non-ductile three-story reinforced concrete structure: A numerical investigation[J].Computers & Concrete, 2021, 10(5):27-33.
Qi M Y, Liang N M, Peng C,et al.Optimization of Demolition Blasting Scheme of Tie Si Yuan Former Building based on Numerical Simulation[J].Blasting, 2021, 15(8):21-27.
Lei Z.The Appraisal and Reinforcement of Brick-Concrete Structure Building before Reconstruction[J].Construction Quality, 2022, 20(12):23-28.
Zusong W, Qi L, Qiuping H,et al.Study on Impacted Parameters of Blasting Vibration on Brick Concrete Structure Based on HHT Method[J].Chinese Journal of Underground Space and Engineering, 2019, 12(4):5-9.
Yi K.Analysis on detection and identification of the brick-concrete residential building structure[J].Shanxi Architecture, 2021, 13(15):19-24.
Lei S, Jun L, Yingkang Y,et al.Numerical simulation and comparative analysis of demolition blasting cut mode of nine-story frame structure[J].China Energy and Environmental Protection, 2022, 23(4):16-20.
Sun J, Jia Y, Xie X,et al.Design criteria for the folding implosion of high-rise RC buildings[J].Engineering Structures, 2021, 233(4):111933-111937.
Jian-Jun Y E, Fei C, Jian-Zhuang X,et al.Green Blasting Demolition Technology of Reinforced Concrete Structures [J]. Blasting, 2019, 31(5):15-20.
Shouwei W.Study on Demolition Blasting Technology for Box-ribbed Arch Bridge of Reinforced Concrete Under Complex Environments [J]. Chongqing Architecture, 2022, 23 (10):9-11.
De-La-Colina J, Valdes-Gonzalez J.Forced-Vibration Tests of a Reinforced Concrete Four-Story Building Structure [J]. Journal of Structural Engineering, 2021, 12 (7): 147-152.